Case studies.
Each one is written the same way: the fault, the diagnosis, the action, the result, and the basis for every figure. Confidential engagements are anonymised to sector and asset type.
Catastrophic failure of PTFE aseptic valve bellows under hydraulic dead-head transient.
A 54-head aseptic rotary can filler lost over half its valve bellows in a single clean-in-place cycle. The OEM and the CIP integrator each blamed the other. The specimens were read first, five competing mechanisms were eliminated on physical evidence, and a calibrated recorder then confirmed the transient. The result: a six-node evidenced causal chain and a three-tier corrective framework.
Outcomes, with the basis stated.
Independent sign-off at four hubs
Controlled the technical acceptance that released multi-million-pound OEM milestone payments, holding acceptance until punch-list items closed.
Commissioned to 85% OEE, then restored it
Lead commissioning engineer for a production centre generating £600m+ a year; returned as subject matter expert to reverse the decline.
Drive fault cleared without changing parts
The OEM rated the fault as an IGBT failure and a nine-hour outage. Knowledge of the drive's internal fault handling had the line at full speed in 35 minutes.
Safety retrofit in four hours
Engineered a dual-channel safety architecture with a monitored reset and installed it in a planned stop. Compliant production within 48 hours of the finding.
Water recovery doubled
A mass balance found the isolated secondary inlet. Reinstated with staged lead-lag recovery, without chatter or water hammer.
Pharma line throughput doubled
Redesigned the outfeed to use idle robotic capacity, and held engineering sign-off as technical authority on GMP change control.
Turnkey safety retrofit of a bulk tipper
Full motorised retrofit with dual-channel hard-wired E-stop, BS EN 60204-1 schematics, itemised £675 BOM and a 62-point validation checklist.
Bring the failure that won't stay fixed.
Interim, contract and project engagements across the UK.