Food processing · CIP

Water recovery doubled

Verified outcome −250 → +100 L/min
Fault
A 40,000-litre process water recovery tank ran negative during peak multi-line CIP cycles: water starvation and pump cavitation risk.
Diagnosis
Mass balance: 600 L/min demand against 350 L/min inflow at 2 bar. A secondary inlet leg had been isolated and stripped of its float, capping recovery at 50%.
Action
Reinstated the inlet with a matching 2-inch float valve, set 100–150 mm below the primary for staged lead-lag recovery without chatter or water hammer.
Result
Recovery capacity 700 L/min: the 250 L/min deficit became a 100 L/min surplus.