Unilever · JEWEL

Commissioned to 85% OEE, then restored it

Verified outcome 85% OEE benchmark
Fault
New, ageing and relocated equipment had to be brought into a production centre generating more than £600m a year; years later, OEE had declined from its commissioning standard.
Action
Lead commissioning engineer and front-line technical authority (2019 to 2021), working with OEM design teams on proprietary PLC interfaces and SCADA integration. Returned as subject matter expert (2022 to 2025): front-line technical authority, critical spares management and continuous improvement leadership.
Result
Lines verified to an 85% OEE benchmark at commissioning; the later decline reversed and performance held at that standard for the rest of the engagement.